EnergySafe Tecnologia
Real results

Measured numbers, not promises.

Case studies with measurements taken before and after installation, at companies across different industries.

Hyundai Mobis
Automotive manufacturing

-18%

Hyundai Mobis

Piracicaba-SP, Brazil

-18% on the energy bill

A pilot with -14% consumption won approval for installation across the entire plant.

Read the full case
Hospital Mater Dei
Healthcare

up to -15%

Hospital Mater Dei

Belo Horizonte-MG, Brazil

up to -15% in overall consumption

Lower voltage and current distortion on all 3 phases and up to 15% less overall consumption.

Read the full case
Hospital Azambuja
Healthcare

-7.11%

Hospital Azambuja

Brusque-SC, Brazil

-7.11% in consumption, confirmed by CELESC

Average reduction confirmed by the utility, even with higher demand.

Read the full case
Shopping Bougainville
Shopping mall

-20.45%

Shopping Bougainville

Goiânia-GO, Brazil

-20.45% in active consumption

A sharp drop in maintenance and equipment replacement, especially lamps.

Read the full case
Food manufacturer
Food

40%→10%

Food manufacturer

Brazil

THD peaks from 40% to 10%

Transient current harmonic distortion peaks sharply reduced.

Read the full case
Get in touch

Want these results at your company?

Cut energy consumption by up to 20% and reduce downtime and unplanned maintenance.

  • Longer life for your equipment
  • Protection against voltage surges
  • 10-year warranty
Main issues (select all that apply)
How would you like us to contact you? *

By submitting, you agree to our Privacy Policy and authorize EnergySafe to contact you.

No cost and no commitment. We serve all of Brazil, Central America and the Caribbean.