Automotive manufacturing-18%
Hyundai Mobis
Piracicaba-SP, Brazil
-18% on the energy bill
A pilot with -14% consumption won approval for installation across the entire plant.
Read the full case
Lower voltage and current distortion on all 3 phases and up to 15% less overall consumption.
Client
Rede Mater Dei de Saúde
Industry
Healthcare
Location
Belo Horizonte-MG, Brazil
Date
Reference letter dated Dec 1, 2021
-0%
in voltage THD
up to -0%
in current THD (3 phases)
up to -0%
in overall energy consumption
The main indicators before and after the device was installed.
Indexed values: before = 100. Reductions reported in the reference letter.
After the power quality analysis, we found lower voltage and current harmonic distortion, an improved current signal and up to 15% less overall energy consumption.
Glauco Peixoto Alves da Silva, Automation and Engineering Coordinator, Rede Mater Dei (summary of the letter)
Automotive manufacturing-18%
Piracicaba-SP, Brazil
-18% on the energy bill
A pilot with -14% consumption won approval for installation across the entire plant.
Read the full case
Healthcare-7.11%
Brusque-SC, Brazil
-7.11% in consumption, confirmed by CELESC
Average reduction confirmed by the utility, even with higher demand.
Read the full case
Shopping mall-20.45%
Goiânia-GO, Brazil
-20.45% in active consumption
A sharp drop in maintenance and equipment replacement, especially lamps.
Read the full caseCut energy consumption by up to 20% and reduce downtime and unplanned maintenance.