Automotive manufacturing-18%
Hyundai Mobis
Piracicaba-SP, Brazil
-18% on the energy bill
A pilot with -14% consumption won approval for installation across the entire plant.
Read the full case
Average reduction confirmed by the utility, even with higher demand.
Client
Hospital Arquidiocesano Cônsul Carlos Renaux
Industry
Healthcare
Location
Brusque-SC, Brazil
Date
Reference letter dated Jan 26, 2022
up to -0%
in current THD (3 phases)
up to -0.0%
in consumption per phase
-0.00%
average consumption (CELESC)
The main indicators before and after the device was installed.
Indexed values: before = 100. Voltage THD: -1.5%. Current THD: -13% to -38% across the 3 phases.
The average 7.11% cut in consumption was confirmed by the utility, CELESC, on the following month's statement, even with higher demand.
Gilberto Bastiani, Administrative Vice Director, Hospital Azambuja (summary of the letter)
Automotive manufacturing-18%
Piracicaba-SP, Brazil
-18% on the energy bill
A pilot with -14% consumption won approval for installation across the entire plant.
Read the full case
Healthcareup to -15%
Belo Horizonte-MG, Brazil
up to -15% in overall consumption
Lower voltage and current distortion on all 3 phases and up to 15% less overall consumption.
Read the full case
Shopping mall-20.45%
Goiânia-GO, Brazil
-20.45% in active consumption
A sharp drop in maintenance and equipment replacement, especially lamps.
Read the full caseCut energy consumption by up to 20% and reduce downtime and unplanned maintenance.