Healthcareup to -15%
Hospital Mater Dei
Belo Horizonte-MG, Brazil
up to -15% in overall consumption
Lower voltage and current distortion on all 3 phases and up to 15% less overall consumption.
Read the full case
A pilot with -14% consumption won approval for installation across the entire plant.
Client
Mobis Brasil Fabricação de Auto Peças
Industry
Automotive manufacturing
Location
Piracicaba-SP, Brazil
Date
Pilot followed by plant-wide rollout
-0%
consumption in the pilot
-0%
demand in the pilot
-0%
on the amount paid (entire plant)
The main indicators before and after the device was installed.
Indexed values: before = 100.
We had commercial and technical support at every stage, from the pilot to the plant-wide installation, always with trust and transparency.
Maintenance Supervisor, Mobis Brasil (paraphrased account)
Healthcareup to -15%
Belo Horizonte-MG, Brazil
up to -15% in overall consumption
Lower voltage and current distortion on all 3 phases and up to 15% less overall consumption.
Read the full case
Healthcare-7.11%
Brusque-SC, Brazil
-7.11% in consumption, confirmed by CELESC
Average reduction confirmed by the utility, even with higher demand.
Read the full case
Shopping mall-20.45%
Goiânia-GO, Brazil
-20.45% in active consumption
A sharp drop in maintenance and equipment replacement, especially lamps.
Read the full caseCut energy consumption by up to 20% and reduce downtime and unplanned maintenance.